ADS-3SWSHD05-MXDE1-FFFFFF
Women's Curved Basketball Shoes | Ascenda Punks
Women's Curved Basketball Shoes | Ascenda Punks
Women's Curved Basketball Shoes | Ascenda Punks
Women's Curved Basketball Shoes | Ascenda Punks
Women's Curved Basketball Shoes | Ascenda Punks

Women's Curved Basketball Shoes | Ascenda Punks

Regular price€95,00
/
Tax included.

Color
Shoe size
  • We ship anywhere for €10. Orders over €120 ship free
  • In stock, ready to ship
  • Backordered, shipping soon

Designed for stability and controlled movement on the court, the AL basketball shoes deliver a balanced feel with structured ankle support and a responsive sole. The upper provides secure containment without unnecessary weight, while the traction pattern is engineered for quick stops and directional changes. A practical, performance-minded design for players who value comfort, grip, and dependable support during intense play. Complete with eyelets and a lace up closure for a classic look

  • The upper is made of leather and the sole is made of Rubber
  • Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
  • Season: Autumn, Spring, Summer, Winter
  • Occasion: Outdoor, Sports
  • Gender: Women
  • Care Instruction: Spot clean only
  • Custom area is the upper, for custom areas please refer to yoycol mockup generator for details 
  • This product is made on demand. No minimums
  • Multiple shipping options available, and cost varies on time efficiency.

Size Guide

 

EUR Size US Size Insole Length(inch) Insole Length(mm)
35 5 8.9 225
36 6 9.1 231
37 7 9.4 238
38 7.5 9.6 244
39 8 9.9 251
40 9 10.2 259
41 10 10.5 266
42 11 10.6 270
43 12 10.9 278

 

Product measurements may vary by up to 3~5mm

EU representative: Europe Gateway International B.V., info@euegi.nl, Kraijenhoffstraat 137 A , Amsterdam, 1018RG, the Netherlands

We offer flat rate shipping of €10 or equivalent on all orders.

Orders over €120 or equivalent ship for free.

Estimated delivery times:
– United States & Canada: 5–10 business days
– Europe: 5–12 business days
– Rest of world: 7–15 business days
(Delivery times may vary depending on location and customs.)

All orders include tracking.
You’ll receive a tracking link via email once your order has been dispatched.

If you have any questions, feel free to contact us at info@ascendaluna.com or our contact page.

Thank you for choosing to ascend with us.

Ascenda luna

wear | remember | Ascend


Ascenda Luna designs with purpose — celebrating science, individual story, and the spirit of becoming.
Every piece is a token of progress. Yours.

Featured in The Future of Fashion 2025

"Ascenda Luna is more than a brand. It’s a statement"

This is fashion for thinkers, dreamers, and doers.

Each piece is crafted with precision and purpose blending timeless design with advanced materials that feel as good as they look. From ultra-soft organic cotton to durable, engineered textiles, our products are made to last — and to elevate.

Inspired by science, driven by story, and rooted in individual progress, Ascenda Luna celebrates those who push boundaries and shape their future.

This is your symbol of ascent.

Hear it from them

★★★★★

Couldn't be happier with the service I received from this company.

Leslie M.
Toronto, ON
★★★★★

Really went out of their way to make me feel special as a customer, highly recommend!

Rachel F.
Los Angeles, CA
★★★★★

Fantastic fabrics, great fit and no issues going through the laundry either!

Sam R.
Brooklyn, NY
★★★★★

Arrived fast and beautifully boxed. They even let me model on their site :)

Sharon S.
New Orleans, LA
★★★★★

Couldn't be happier with the service I received from this company.

Matt C.
Montreal, QC
TRIBUTE TO SCIENCE

FOR THE ONES WHO WENT FIRST

Tribute to Science series honors the pioneers — the physicists, biologists, engineers, and figures who shaped the world but never sought the spotlight.

Each design tells a story. Each piece carries a name, a legacy, a spark of genius that helped humanity ascend.

We created this series not just to remember — but to inspire the next minds who’ll change everything.

Wear it for them.
Wear it for you.

You may also like


Recently viewed

Ascenda Luna limited edition

Every breakthrough is wearable

30 days only || Never restocked

12

DAYS

12

HOURS

12

MINUTES

12

SECONDS